Login
Falcon
Home
Manufacturing Home
Home
History
Facility
Offices
Shops
Yards
Services
Cutting
Welding
Forming
Machining
Design / Drafting
Products
Electrical Utilities
Transportation
Precast Concrete
Mining
Building Construction
Contact
Galvanizing Home
Home
Facility
Yard
Chemical Tanks
Kettle
Spinner
Services
Structural & Fabricated Parts
Fasteners, Threaded Rods, Nuts & Washers
Benefits
Contact
X
Close
Loading...
Please ensure that javascript is enabled on your browser.
Please ensure that cookies is enabled on your browser.
Forgot Password
Login
Call Us
204.927.7000
Home
Manufacturing Home
Galvanizing Home
Menu
Home
History
Facility
Offices
Shops
Yards
Services
Cutting
Welding
Forming
Machining
Design / Drafting
Products
Electrical Utilities
Transportation
Precast Concrete
Mining
Building Construction
Contact
Home
Facility
Yard
Chemical Tanks
Kettle
Spinner
Services
Structural & Fabricated Parts
Fasteners, Threaded Rods, Nuts & Washers
Benefits
Contact
gallery
Send to a Friend
Your Name
Your Email
Friend`s Name
Friend`s Email
Your Message
Send Message
Back to Electrical Utilities
‹
›
North west transmission line
Electrical Utilities
/ Products
OWNER
B.C. Hydro
CUSTOMER
Burns McDonnell
OUR SCOPE
Design assist, Detail and Fabricate Various Guyed Tower Foundations
QUANTITY
600 tons
TIMEFRAME
June 2012- Sept. 2013
CHALLENGES
The low temperature steel grade requirements for this contract made material procurement difficult and design alterations were necessary to allow use of material sections available in the specified grade.
-Another challenging requirement was for a “Paint over Galvanized” coating system in order to achieve a 70 yr. lifespan.
Home
|
Sitemap
|
Contact
|
Login
|
WCMStudio™
©
2022
Falcon Manufacturing & Galvanizing Ltd.
All rights reserved.